Five reach stackers and three container crane systems operate at the 200,000 m² container handling facility.
In addition to ship loading, these are also used for rail and truck loading.
ABF was commissioned as general contractor to equip the entire site with a WLAN data radio system and all vehicles and cranes with a position detection system.